After the Viewer approves the cost, a Contract concept ( between the Service Provider and the Viewer) is created in the service registry. 查看者批准该成本后,将在服务注册中心创建契约(在服务提供者与查看者之间)。
Finance looks at cost drivers, contract management, cost of the value chain, rate of return, and costs of maintenance. 财务(Finance)关注成本驱动、合同管理、价值链的费用、回报率、维护费用。
Progress control should be carried out jointly with cost control and contract management; 进度控制宜与成本控制和合同管理相结合;
Perform budgeting and implement cost control, contract procurement control, cash forecast and financing to ensure cash available for business operations. 履行预算管理及成本控制,执行采购控制,现金预测和融资活动以确保业务运营所需的资金。
The enterprise manufacture cost contract under the conditions of asymmetric information 不对称信息条件下企业生产成本契约的设计
The cost of the contract was'commercially confidential'but updated information about the clinical benefits and pricing had been taken into account. 该合约的价值是“商业机密”,但有关的临床益处和定价的最新信息已在考虑中。
Total cost of the contract to enter the systems development and demonstration phase is$ 19 billion. 该合同在系统开发和论证阶段的总费用是190亿美元。
Logistics Cost Saving Contract based on Multi-party Coordination and Common Agency 基于共同代理的多方协调下物流成本节约合同
If the programme of the works is such that inserts cannot be cast in the concrete, then approved expansion bolts shall be used for fixing the brackets provided and installed by the lift contractor, at no additional cost to this contract. 若根据工程的规划,镶嵌件不能铸进混凝土,则须使用经认可的膨胀螺栓来固定由电梯承包商提供并安装的托架,无需向该承包商支付额外的费用。
The Research Pattern of NIE from the Perspectives of Transaction Cost and Contract 从交易费用和契约看新制度经济学研究范式
Dynamic management of engineering projects manifests itself in quality control, progress management, cost management, contract management, security management and information management and is key to policy-making and implementation of decisions. 摘要关于工程项目的动态管理,它体现在项目的质量管理、进度管理、成本管理、合同管理、安全管理和信息管理等方面,是项目管理工作中决策的计划与实施相结合的关键。
We must reckon with all possible difficulties when we are considering the cost of the contract. 我们考虑合同费用时必须认真考虑所有潜在的困难。
Analysis of agency cost of contract form of state-owned enterprises 国有企业契约形式下的代理成本分析
The influence factors reverses losses include political cost, debt contract and ST. 公司扭亏行为盈余管理影响因素包括政治成本、债务契约、ST等因素;
There are three respects mainly: the cost contract model, the profit contract mode and psychological contract mode. 主要是三个方面:成本契约模式、利润契约模式和心理契约模式。
It introduces importance of and cost control in item management department, discusses strong management of item cost& contract budget, and points out that good economic effects will not be produced until management is strengthened and cost is reduced. 介绍了项目经理部合同预算管理与成本控制的重要性,从加强项目成本管理、加强合同预算管理等方面进行了论述,指出只有加强各方面的管理,降低成本,才能创造出好的经济效益。
The paper researches the ownership arrangement with the paradigms of transaction cost and incomplete contract, simultaneously. 本文在交易费用和不完备契约分析范式内完成。
Viewing from institutional economy prospective, an analysis is made on bank-firm relationship, which will have impact upon information problem, transaction cost, contract selection and financial innovation, etc. 以制度经济学的视角对银企关系分析,其将对信息问题、交易成本、合约选择和金融创新产生影响。
This paper discusses the characteristic and the scope of the fixed price contract and the cost compensation contract in the development of military weapon, and several problems that we should pay more attention on when selecting the contract type. 本文探讨了型号研制的固定价格合同和成本补偿合同的特点及适应范围,以及选择合同类型时应注意的几个问题。
Then, the models for each kind of cost and contract cost are estabished, which provide a basis for the study of cost/ schedule behaviour state and integrated control information system. 在此基础上,建立了各类费用控制目标的设置模型以及合同项目投资控制目标设置模型.所建立的模型为研究费用/进度控制系统行为状态和集成控制信息系统奠定了基础。
The conclusion is: a process for the implementation of a project management and evaluation costs clues responsibility reward system is notably total project cost management contract at the heart. 本文的结论是:构建一个以项目实施流程为线索的责任成本管理和考核奖惩体系,是EPC总承包工程项目成本管理的核心所在。
Then I've represented theoretical framework of neoclassical theories, transaction cost, contract theory, specialization theory, uncertainty theory and other conceptions and analysis related to firm and its growth in relevant paradigm of research. 接着本文给出了新古典理论框架、交易费用框架、合约理论、专业化理论、不确定性理论及其他相关的分析范式中的企业与企业成长的有关概念、内容和分析。
There are five critical control elements for a engineering& construction project, i.e. schedule control, cost contract control, quality control and HSE ( health, safety, environment) control. 工程项目的控制要素分成五大类,即项目的进度控制、费用控制、合同控制、质量控制和HSE控制。
Secondly, the paper from cost system, key index, operation principle and risk management states the Target Cost Contract, as well as in view of the contract structure, describing the characteristics of the contract operation. 然后从成本体系、关键指标、运行原理和风险管理等方面陈述了目标成本合同的模式,针对成本合同的组成结构以及内容,详细叙述了合同的特点、合同的运作模式。
This theory has laid the foundation for the emergence and growth of Target Cost Contract ( TCC). 这一理论为目标成本合同模式的出现以及发展奠定了基础。
Using game theory, from the perspective of cost and contract, set up a dynamic game model, the results showed that the two companies cooperate with each other and set up long-term partnership can achieve a Pareto optimum. 利用博弈理论,从成本和合约的角度进行供应链合作分析,建立了动态博弈模型,结果发现,农业供应链中两个企业相互合作,并建立长期伙伴关系,能实现了帕累托最优。
Target Cost Contract has gradually developed into mature project payment in foreign and was given successful application in large projects in Hong Kong. 目标成本合同在国外渐渐地发展为成熟的项目支付方式,在国外及中国香港地区的大型项目中均得到了成功的应用。
On the one hand, earnings management in the reasonable range can promote the realization of the company goal, motivate managers, and reduce the cost of contract. 盈余管理具有两面性,一方面,在合理范围内的盈余管理可以促进企业实现经营目标,可以起到激励管理者的作用,也可以降低契约成本。
Then the author further analyzes the optimal decision and the optimal profits, and introduces the revenue sharing and cost allocation contract and proved its efficiency. 随后,笔者深入分析了各主体的最优决策和最优利润,在此基础上引入收入共享成本共担契约并证明了其有效性。
Firstly, This article discusses in detail the basic theory of Target Cost Contract and does a deep analysis to the relevant theories& cooperation and motivation. 文章首先详尽综述目标成本合同的基本理论,并对合同模式的相关理论&合作和激励做了深层次的分析。